TR-830 Workflow Overhaul

Two substrates, two overmolds

Overview

Joined B76's process engineering team to troubleshoot and optimize TR-830 production.

My Role

Led installation of new tracability procedures, live network reporting and improved visualization for management.

Key Skills

Results

Introduced variable timescale yield statistical tracking for substrates. Introduced tracability and turnaround time tracking for overmolded parts. Continuing to develop automated manufacturing for overmolding process.

← Back to Projects